On December 12, President Shavkat Mirziyoyev traveled to the neighborhoods of Tashkent city to become acquainted with the people’s lifestyle, the preparation for winter, and the landscaping work. First, the Head of state visited the heating plant of Toshkent Issiqlik Markazi enterprise in Uchtepa district. During his visit to this facility last year, it was in a terrible state. Constructed in 1969, it had never gone through substantial renovations. Boiler houses and networks were outdated. Last winter, due to a cold spell, there were interruptions in heat production. Therefore, the President commanded to repair boiler houses and improve the dependability of heating networks.

During his current visit, the responsible persons reported on the work done and fully executing these instructions. The boiler houses of the complex have a total capacity of 700 Gcal. They heat more than one thousand apartment buildings and about 400 social establishments.
This year, a fuel oil facility and storage facilities were constructed, and two boilers were adapted to operate in mixed mode – on gas and fuel oil. As a result, the boiler room and networks function securely even at low temperatures. In such cases, reserve fuel oil is used. Thanks to additional pipe insulation, heat loss has been decreased.

Here, the Head of state talked with the leadership of the cities of Tashkent and Uchtepa. The necessity was noted to set up the effective operation of the new “mahalla seven” system, to make sure that social matters are addressed locally, in line with the population’s requirements.
The measures taken in preparation for winter must be genuinely reflected in people’s lives. An urgent task is the prompt solution of emerging problems in heating plants and networks and heat conservation in buildings and premises.

UzA